Layout Timelapse
Snapshots of the whole layout over time.
17 October 2020 Work has begun on the cut. (Layout is turned 180°.)
27 September 2020 Installed a new work light over the layout.
31 August 2020 Started scenery.
7 August 2020 Made many changes during a five-day hurricane blackout.
5 August 2020 Added the runaround at Bearcamp Springs. (Layout is turned 180°.)
22 May 2020 Building structures like crazy.
6 April 2020 Moved the enginehouse.
31 March 2020 Extended the front of the layout four inches.
23 March 2020 Just finished tracklaying.
Copyright © 2017-2020 by David K. Smith. All Rights Reserved | Site Map
|