8b.2. Mill Spillway

I spent a considerable amount of time finding the perfect sound to accompany the falling water of the spilllway. Following that, the challenge was finding the ideal place for the speaker. On 19 October 2020, I installed the speaker on the hillside immediately above the spillway; it'll be covered with a thin scenery membrane.

Previous < Return > Next

Copyright © 2017-2020 by David K. Smith. All Rights Reserved | Site Map