Daphne Water TowerThe Daphne water tower was relatively easy to install. After leveling the terrain where the tower would stand with a sanding stick, I marked out its footprint. Next, I drilled 1/8-inch holes at the corners of the perimeter. Then I glued pieces of bamboo skewer stick into the holes, and trimmed them to height. Finally, I applied healthy globs of thick CA into the corners of the tower base interior, and pressed it down onto the skewer sticks. In a few moments, the tower was immovable. A few bits of Silflor tufts around the base completed the installation. Now I need to turn my attention to the freight station, which awaits cosmetic repair. (I can see I also need to straighten the ladder on the newly-installed water tower!) Back < Index > NextCopyright © 2011-2021 by David K. Smith. All Rights Reserved. |