Building the Layout Room, Part 1

After finding a dream property for my dream home in the fall of 2013, I began designing the house in earnest the following spring. The earliest drafts included a modest 10 x 10 foot combination layout room and "workshop." By the time my final draft reached the architect, it was a 10 x 13 foot "studio." Then, just before turning the blueprints over to the excavator, I enlarged it once more to 11 by 15.

Of course, since I was in complete control of all aspects of the house design, I could have made a much larger layout room. After all, isn't that the dream of most modelers? To have an enormous space for a dream layout? That was my feeling at first, naturally. But then reality hit home: my skills have diminished, and I have far fewer days ahead than behind. Could I ever make full use of an 80 by 100 foot layout room? Such a large space also carried a cost burden: construction, heating, cooling, and property taxes, not to mention the materials needed to build a huge layout. I had to be realistic about what I could achieve, as well as what I could afford, in the long run. And so the layout room stopped growing.

29 February 2016 marked groundbreaking for my new home, and by 11 AM the excavators were working on the area that would eventually be occupied by the layout room. About 24 hours later, the footing forms were in place; the large rectangle to the right in the second image was the room in its earliest manifestation.

By 3 March, the footings were completed, and soon the labyrinthine forms for the foundation walls were being erected.

The following week, the foundation walls were poured; by 16 March the space was beginning to take shape.

At around 10 AM on 26 March 2016, the layout room got its concrete floor.

Framing for the room was under way by the end of April (below left), and by mid-May the framing was finished and the roof was on (below right).

After the exterior sheathing went on, I did the wiring. But then the house project stalled, and the space sat untouched for a year. Work resumed in October 2017, when I completed the HVAC ductwork (below left). The next step would be sheetrock, which may still be some months away.

Meanwhile, I've been tinkering with a track plan...