The Railwire January 2018 Modeling Challenge: Main Assembly

Main assembly began once I had all of the walls completed, including the installation of windows and doors (I determined that it was impractical to attempt to finish them separately and drop them in after the building was painted).

After completing the back walls and additions, the rest of the building materialized quite quickly.

Previous | Return | Next

Copyright © 2017-2020 by David K. Smith. All Rights Reserved | Site Map