Fort Hanover: Scenery and Detailing

Scenery began on 3 June 2019 with the terrain for the farm, which consists of pre-colored, pre-mixed sanded grout applied directly to the base.

By 24 June the scenery base was done and it was time for greenery and details.

On 25 June 2019 at around 2 PM the layout reached the 99% mark; all that's left is one corner and the stream.

The layout was finished on 26 June 2019.

Return

Copyright © 2017-2020 by David K. Smith. All Rights Reserved | Site Map