2.20. Foot Bridge

It took a lot of time and effort to find a home for the pedestrian overpass, but I finally did it. Granted, out of necessity it's incomplete, with one staircase lopped off, but enough of it is there to put a smile on my face. It was completed and installed on 2 March 2021.

Then, on 11 March, I was inspired by a new building flats project to add a 2D extension to the foot bridge to "finish" it.

Pola B268 — A DKS Retro Fave

This is a well-tooled kit that's been a staple in my kitbashing stockpile.

Return

Copyright © 2017-2021 by David K. Smith. All Rights Reserved