To-Do List: Sheetrock Walls

To get the ball rolling, there was enough rock left over from doing the ceilings to button up the garage so I'm not wasting energy trying to heat it. Officially the first wall to be rocked was the back of the coat closet, on 9 February 2019; the rest of the wall was completed the following day. And the whole foyer was rocked by 11 February.

The delivery of sheetrock on 27 June 2019 allowed me to finish rocking the bathroom the following day.

30 June 2019 marked the point when most of the living space got done.

By 21 July 2019, the whole house was sheetrocked save for the studio and 8 feet of the garage. But the rock needed to finish everything wasn't purchased until 7 January 2020.