To-Do List: Septic Pump Control

Because the disposal field is higher than the main living space, the septic system required a pump, which in turn required a control unit, installed on 12 August 2018.

The ditch for the wire conduit was dug by my helper on 23 January 2019. The control unit wasn't wired until 2 June 2019.

Note that the entire area will eventually receive more soil to raise the grade up to the tops of the two septic access lids.