To-Do List: Meter PanAfter asking my electrical contractor what to order, I installed the meter pan on 11 September 2018:
Originally I was going to have him connect the meter pan (below left) to the breaker panel (below right). However, he declined to do the job as it would have only been a half-hour of work, so I did it myself on 30 September 2018. I must say, I would not enjoy working with 3/0 wire on a regular basis.
The next step was to install the underground service line conduit. Return | To-Do ListCopyright © 1996-2026 by David K. Smith. All Rights Reserved.
|